New 3 Axle Steel Tipper Tipping Trailers

  • New 3 Axle Steel Tipper Tipping Trailers
  • New 3 Axle Steel Tipper Tipping Trailers
  • New 3 Axle Steel Tipper Tipping Trailers
New 3 Axle Steel Tipper Tipping Trailers
  • zw-trailer
  • Shandong
  • 35 days
  • 150 sets

new tipper trailers is suitable for the transportation of loose goods such as coal, ore and building materials. Engineers will design according to the load, the type of goods, and the road conditions to meet different usage needs.
The 3 axle tipper trailer adopts the method of side-turning and back-turning self-unloading, which can effectively improve the transportation efficiency of bulk goods transported by the loader.
The spraying method of the steel tipping trailers adopts the semi-automatic method combined with manual adding of the machine, and uses the poly source grease paint, which is anti-corrosion and environmentally friendly.

 3 axle tipper trailer sophisticated technology: The main components are processed by advanced equipment, the longitudinal beams are made by fully automatic submerged arc welding, and the assembly machine is used to accurately assemble the axles and leaf springs.

3 axle tipper trailer

The structure of the new tipper trailers design is reasonable, and the center of gravity of the chassis is low. And the steel tipping trailers lifting hydraulic system is stable, the design of the oil circuit is reasonable, the lifting of the oil cylinder synchronization, the hydraulic system is the power source for the dumping of the semi-trailer dump, it is composed of the main original components such as the pump set, valve set, oil tank, pipeline, oil cylinder, etc. The hydraulic system must be stable to ensure the normal discharge.

new tipper trailers

steel tipping trailers

Main frame and sub frame: Longitudinal beam , using high strength structural steel and offering bending and shock resistance, can meet heavy load requirements. Using high strength 16Mn structural steel and integrated hydraulic system increases operation accuracy. 

3 axle tipper trailer

FAQ
Q: How long it will take for an order to be delivered?
15 to 20 working days after we received your 30% payment inadvance or 100% L/C at sight. The specific delivery time depends on the items and the quantity of your order....more
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right